亚洲电话一区二区三区四区五区11,9999在线免费视频,亚洲一二三久久亚洲精品,青草视频在线观看9,国产久久视频在线,久久人妻中文字幕,久久婷婷,国产精品,亚洲中文字幕无码喷水,99人妻少妇人妻少妇

Welcome to the official website of Yunhai Zhicheng Technology Co., Ltd!
Hebei Yunhai Zhicheng Electric Technology Co Ltd河北云海志誠電氣科技有限公司
hotline:400-0311-527
Location: Home >News Center >FAQ

Consultation Hotline

400-0311-527

Precautions for installation of power monitoring system

作者: 點(diǎn)擊:1828 發(fā)布時間:2020-07-14

1. When the monitor is installed on the wall, its bottom edge should be 1.3m~1.5m above the ground (floor), its side near the door axis should not be less than 0.5m from the wall, and the front operation distance should not be less than 1.2m; 2. When installing on the ground, its bottom edge should be 0.1m to 0.2m higher than the ground (floor). And meet the following requirements: 1) The operating distance in front of the equipment panel should not be less than 1.5m when arranged in a single row; When arranged in double rows, it should not be less than 2m; 2) On the side where the on duty personnel often work, the distance from the equipment panel to the wall should not be less than 3m; 3) The maintenance distance after equipment installation should not be less than 1m; 4) When the arrangement length of the equipment panel is greater than 4m, channels with a width of not less than 1m should be set at both ends. 3. The monitor should be installed firmly and not tilted. When installed on lightweight walls, reinforcement measures should be taken. 4. The cables or wires introduced into the monitor should meet the following requirements: 1) The wiring should be neat, avoid crossing, and securely fixed; 2) The ends of cable cores and accompanying wires should be labeled with numbers and consistent with the drawings, with clear and non fading handwriting; 3) Each terminal block (or row) of the terminal board should not have more than 2 wires connected; 4) Cable cores and wires should have a margin of less than 200mm; 5) The wires should be tied into bundles; 6) After the wire is introduced into the conduit, it should be sealed at the entrance of the conduit. 5. The main power supply lead of the monitor is strictly prohibited from using a power plug and should be directly connected to the fire power supply; The main power supply should have clear markings. 6. The grounding (PE) wire of the monitor should be firm and clearly marked. 7. The terminals with different voltage levels, current categories, and functions inside the monitor should be separated and clearly marked.

備案號:冀ICP備2021011160號-1

巧家县| 长治县| 虎林市| 卓尼县| 乌兰察布市| 赫章县| 洛川县| 新晃| 阳原县| 武平县| 夏邑县| 清远市| 道真| 武清区| 阳原县| 新竹县| 肃南| 呼图壁县| 彩票| 扶风县| 镇安县| 巧家县| 云安县| 合江县| 墨竹工卡县| 荥经县| 岗巴县| 丹江口市| 乳山市| 江源县| 门源| 南川市| 双桥区| 涟水县| 唐海县| 绿春县| 公安县| 江源县| 称多县| 郴州市| 诸暨市|